CareerExamPro

ASQ Certified Quality Engineer, Auditor & Reliability (CQE/CQA/CRE) practice test

8 practice questions for this exam, each with a full explanation and cited rule or blueprint reference.

Start practising

RAPS RAC, ACRP/SOCRA, MPJE & ASQ CQE: practice drill

10 realistic exam questions, graded as you go, with the exact rule or statute citation for every answer. Start free, no sign-up.

Practice tests that prepare you for this exam

Practise by topic

About this exam

Agency / Issuer
ASQ
Region
Global / Online

Exact question counts, passing scores, and allowed reference materials vary by testing window and state/agency. Always confirm current rules with the official testing provider.

Sample questions

A medical catheter extrusion line operates in statistical control with a normal output distribution for outer diameter. Engineering specifications and process parameters are:

TEXT
Specification Limits : 10.00 ± 0.30 mm  (LSL = 9.70 mm, USL = 10.30 mm)
Process Mean (mu)    : 10.06 mm
Process Std Dev (s)  : 0.05 mm

What are the process capability indices Cp and Cpk, and what do they indicate about the extrusion process?

  1. Cp = 2.00 and Cpk = 2.40, showing that the upward mean shift raises actual capability above Cp.
  2. Cp = 1.00 and Cpk = 0.80, showing that process spread equals tolerance width and requires sorting.
  3. Cp = 1.60 and Cpk = 2.00, showing that process spread exceeds tolerance despite accurate centering.
  4. Cp = 2.00 and Cpk = 1.60, showing strong capability slightly lowered by an upward mean shift.
Show the answer

D. Cp = 2.00 and Cpk = 1.60, showing strong capability slightly lowered by an upward mean shift.

Potential capability Cp = (USL - LSL) / (6 * sigma) = (10.30 - 9.70) / (6 * 0.05) = 0.60 / 0.30 = 2.00. Actual capability Cpk = min((USL - mu)/(3 * sigma), (mu - LSL)/(3 * sigma)) = min((10.30 - 10.06)/0.15, (10.06 - 9.70)/0.15) = min(0.24/0.15, 0.36/0.15) = min(1.60, 2.40) = 1.60. By definition Cpk <= Cp; here, Cp = 2.00 > Cpk = 1.60 confirms that the process has tight inherent dispersion but is shifted 0.06 mm above nominal toward the USL.

Reference: ASQ Certified Quality Engineer (CQE) Body of Knowledge — Process Capability (Cp & Cpk)

A medical device incoming-inspection plan under ANSI/ASQ Z1.4 has an Operating Characteristic (OC) curve showing a probability of acceptance P_a = 0.95 at an Acceptable Quality Limit (AQL) of 1.0% defective, and P_a = 0.10 at a Rejectable Quality Level (RQL / LTPD) of 5.0% defective. Which statement correctly characterizes the sampling risks and Z1.4 switching rules?

  1. Producer's risk (alpha) is 0.95, Consumer's risk (beta) is 0.90, and Normal shifts to Tightened after 5 rejected lots.
  2. Producer's risk (alpha) is 0.10, Consumer's risk (beta) is 0.05, and AQL guarantees no accepted lot exceeds 1.0% defective.
  3. Producer's risk (alpha) is 0.05, Consumer's risk (beta) is 0.10, and Tightened begins if 2 of 5 consecutive lots fail.
  4. Producer's risk (alpha) is 0.01, Consumer's risk (beta) is 0.05, and Tightened reverts to Normal after 2 accepted lots.
Show the answer

C. Producer's risk (alpha) is 0.05, Consumer's risk (beta) is 0.10, and Tightened begins if 2 of 5 consecutive lots fail.

On an OC curve, Type I Producer's Risk (alpha) is the probability of rejecting a good lot at the AQL: alpha = 1 - P_a(AQL) = 1 - 0.95 = 0.05 (5%). Type II Consumer's Risk (beta) is the probability of accepting a bad lot at the LTPD/RQL: beta = P_a(LTPD) = 0.10 (10%). Under ANSI/ASQ Z1.4 switching rules, inspection moves from Normal to Tightened when 2 out of 2, 3, 4, or 5 consecutive lots are rejected on original inspection (and returns from Tightened to Normal only after 5 consecutive lots are accepted).

Reference: ANSI/ASQ Z1.4 (Sampling Procedures and Tables for Inspection by Attributes — OC Curves & Switching Rules)

An electronic telemetry module inside an implantable cardiac device exhibits a constant random failure rate of lambda = 2.0 x 10^-5 failures per hour during its useful-life phase (exponential distribution). What are the module's Mean Time Between Failures (MTBF) and mission reliability R(t) = e^(-lambda * t) over a 10,000-hour operating mission?

  1. MTBF = 50,000 hours, and mission reliability R(10,000) = 81.87% (using e^-0.20).
  2. MTBF = 50,000 hours, and mission reliability R(10,000) = 80.00% (using 1 - lambda*t).
  3. MTBF = 20,000 hours, and mission reliability R(10,000) = 60.65% (using e^-0.50).
  4. MTBF = 500,000 hours, and mission reliability R(10,000) = 98.02% (using e^-0.02).
Show the answer

A. MTBF = 50,000 hours, and mission reliability R(10,000) = 81.87% (using e^-0.20).

For an exponential (constant failure rate) distribution, MTBF = 1 / lambda = 1 / (2.0 x 10^-5) = 50,000 hours. Over t = 10,000 hours, the exponent is lambda * t = (2.0 x 10^-5) * 10,000 = 0.20. Therefore, R(10,000) = e^(-0.20) = 0.81873 (81.87%), with cumulative unreliability F(10,000) = 1 - 0.8187 = 18.13%. (Linear approximation 1 - lambda*t = 80.00% understates exact exponential reliability.)

Reference: ASQ Certified Reliability Engineer (CRE) & CQE — Exponential Reliability Distribution

Taking this exam soon?

Tell us which exam domains or calculation drills you want more practice on.

Other Biopharma Regulatory & Quality exams